Posts Tagged: Geotextiles

/ Work

Large Soils Shear Box Modification

We decided to add 2 inches to the bottom part of the large soils shear box and 2 or 3 inches to the top box. We ordered the steel and I had to drill and tap holes to attach the

/ Work

Large Soils Shear Box Modification

We decided to add 2 inches to the bottom part of the large soils shear box and 2 or 3 inches to the top box. We ordered the steel and I had to drill and tap holes to attach the