Category Archives: Work

/ Work

Hanging a 55 Kip (55,000lb) Hydraulic Actuator

  This is a test setup that we helped put together in the new MMSEC building at KU. It will fatigue the test specimen when loaded. We hung the cylinder and I section with chain hoists with straps going across

/ Work

Hanging a 55 Kip (55,000lb) Hydraulic Actuator

  This is a test setup that we helped put together in the new MMSEC building at KU. It will fatigue the test specimen when loaded. We hung the cylinder and I section with chain hoists with straps going across

/ Work

Lockable Compartments for Equipment Storage

These compartments were made using existing cabinets. Each part was sectioned off to itself using Masonite and strips of 1” by 1” wood. I just put hasps on all of the sections after that and added padlocks to it so

/ Work

Lockable Compartments for Equipment Storage

These compartments were made using existing cabinets. Each part was sectioned off to itself using Masonite and strips of 1” by 1” wood. I just put hasps on all of the sections after that and added padlocks to it so

/ Work

Concrete Mold

Here is a concrete mold that I designed and put together. The dimensions had to be rigid, and very precise to meet standards. We were short on time and these molds had to be made quickly. I cut out all

/ Work

Concrete Mold

Here is a concrete mold that I designed and put together. The dimensions had to be rigid, and very precise to meet standards. We were short on time and these molds had to be made quickly. I cut out all

/ Work

Self Reacting Large Scale Loading Frame, 100 kip (100,000 lbs) capacity.

Here is a full scale railroad testing frame that I helped put together. The hole pattern was decided and each column had to be drilled out with a magnetic drill. This took a lot of time to do. A plate

/ Work

Self Reacting Large Scale Loading Frame, 100 kip (100,000 lbs) capacity.

Here is a full scale railroad testing frame that I helped put together. The hole pattern was decided and each column had to be drilled out with a magnetic drill. This took a lot of time to do. A plate

/ Work

Tell-Tale for Measuring Vertical Displacement of Soil Deformation.

Here are some tell-tales that I welded for a project. I have a more efficient design using threaded rods, nuts washers, and a much smaller outside diameter tubing used in other projects. I made several for this project. Tell-tales are

/ Work

Tell-Tale for Measuring Vertical Displacement of Soil Deformation.

Here are some tell-tales that I welded for a project. I have a more efficient design using threaded rods, nuts washers, and a much smaller outside diameter tubing used in other projects. I made several for this project. Tell-tales are

/ Work

Pneumatic Cyclic Loading Upgrade for Test Frame

We needed to run cyclic loading for a project. It uses an electo-pneumatic transducer with an input of 0-10 volts with a pnuematic cylinder with a spring return, along with a wave form generator to make it cycle. We did

/ Work

Pneumatic Cyclic Loading Upgrade for Test Frame

We needed to run cyclic loading for a project. It uses an electo-pneumatic transducer with an input of 0-10 volts with a pnuematic cylinder with a spring return, along with a wave form generator to make it cycle. We did

/ Work

40” by 40” Custom Pneumatic Test Press

Here is a custom test press I made from scratch using 5 inch box steel with 1/4 inch walls on it. First I cut up all of the steel using a band saw. I made the initial base by making

/ Work

40” by 40” Custom Pneumatic Test Press

Here is a custom test press I made from scratch using 5 inch box steel with 1/4 inch walls on it. First I cut up all of the steel using a band saw. I made the initial base by making

/ Work

Loading Cylinder for Cyclic Loading

We needed a cylinder going horizontal for cyclic loading for one of the test projects for testing asphalt pavement. They determined a diameter that they wanted to use. We had some structural tubing laying around the lab that fit the

/ Work

Loading Cylinder for Cyclic Loading

We needed a cylinder going horizontal for cyclic loading for one of the test projects for testing asphalt pavement. They determined a diameter that they wanted to use. We had some structural tubing laying around the lab that fit the

/ Work

Slide Hammers

Over they years I have made several slide hammers to compact soil. I usually use a piece of 2 inch round stock and drill a center hole in it with either a lathe or mill oversize to whatever rod I

/ Work

Slide Hammers

Over they years I have made several slide hammers to compact soil. I usually use a piece of 2 inch round stock and drill a center hole in it with either a lathe or mill oversize to whatever rod I

/ Work

Large Soils Shear Box Modification

We decided to add 2 inches to the bottom part of the large soils shear box and 2 or 3 inches to the top box. We ordered the steel and I had to drill and tap holes to attach the

/ Work

Large Soils Shear Box Modification

We decided to add 2 inches to the bottom part of the large soils shear box and 2 or 3 inches to the top box. We ordered the steel and I had to drill and tap holes to attach the